Operation Flow
|
In EPC Consortium Sdn Bhd, there are two (2) major processes: |
|
Import Process
|
Import process consist of process where cargo are transported by lorries from exporter to EPCC stockyard in Kuantan Port. This 13.0 acres operation area consist of 4 main stockyard with 35,000 mt to 45,000 mt capacity depends on cargo type . 4 weighbridges, and 2 lines of washing bay to maintain continuous cargo flow and cleanliness of lorries. |
|
|
|
|
|
Continuous Export Process
|
Our export process is a continuous process of vessel loading from stockyard through reclaimer to ship loader convey by 805m of a belt conveyor system with a rated capacity of 2000tph. Our ship loader with 25 meters boom length and 10 degrees working angle(12-meter height) together with wharf CB6 that has a maximum permissible draft of 11.2 meters are able to load up to 50,000 Dwt vessel at any moment. |
|
|
|
|
|
|